Shanghai Chi Tang Electronics Co., Ltd. 主营:
咨询电话:13661497600
产品详情

The safety performance of integrated testing system for ZHZ36 type busbar

  • 如果您对该产品感兴趣的话,可以
  • 产品名称:The safety performance of integrated testing system for ZHZ36 type busbar
  • 产品型号:ZHZ36
  • 产品展商:Shanghai
  • 产品文档:无相关文档
简单介绍

ZHZ36 bus slot safety performance comprehensive test system is a kind of intelligent multi-function instrument which can directly or automatically connect the ground, insulation and withstand voltage.

产品描述

1 ZHZ36 type busbar safety performance testing system Summary

This system is a kind of intelligent automatic or single grounding, insulation, pressure tested multifunctional instrument. The instrument is easy to operate, is in line with the GB4706.1 "The test of household and similar electrical appliances - General requirements for safety" and other relevant national standards in terms of the requirements of the test equipment needed.

2 ZHZ36 type busbar safety performance testing system Specification and technical characteristics

Two point one Product features

( One The measurement procedure (custom) method described below).

( Two ) can be set up in advance all the tested values and limit alarm value.

( Three ) can automatically use voice to determine whether the detected object is qualified.

Two point two The conditions of use

ambient temperature Five C ~ Thirty C

The relative humidity is not more than Seventy-five %

Power supply 220V Tolerance. Ten %, 50Hz

No strong electromagnetic interference source, without a lot of dust and corrosive gas, good ventilation.

Two point three The power consumption of about (150W Does not include the outer loop ) .

Two point four Size 550mm * 550mm * 1300mm (including wheel).

Two point five weight 70kg .

Two point six The tester technical parameters range and accuracy

3 ZHZ36 type busbar safety performance testing system Safety precautions

Three point one Before using please read the instructions and follow the instructions step in operation.

Three point two Do not use non original accessories, in order to avoid danger.

Three point three The operation must be around the laying of high voltage insulation rubber.

Three point four In order to ensure the accuracy of measurement, such as self test leads should not lead the length of more than the original offer.

Three point five Before starting the power, you must carefully check the connection test and test grounding clip is loose.

Three point six Start after power, should carefully check the set position switch, test button, potentiometer and regulator.

Three point seven After pressing the "start" button, button and other contact test line shall not adjust the test system and the measured object.

Three point eight The entire test after the end of the process, to press the "reset" button, can remove the test line.

Three point nine At the end of the testing process, whether the result is qualified, are required to press the "reset" button ( To reset the system ) Otherwise, the system response of the next test.

Three point one zero The test clamp shall not be arbitrarily placed, when not in use and not the system cabinet or the earth, to prevent the misuse of the test instrument damage.

Three point one one Such as the discovery of system test is abnormal, can press the "reset" button or shutdown to suspend the whole system test to be restored after the restart test.

Three point one two Because the computer control system, with the corresponding requirements of the output power, in order to ensure the measuring precision, proposed user configuration and power output to match the AC regulated power supply.

Three point one three Avoid using in the following circumstances

( One Avoid placing) in direct sunlight, rain and moisture.

( Two Please stay away from fire and heat), to prevent the high temperature of the machine.

( Three ) handling or maintenance, should be shut down and power line will be removed, and the cabinet can not be inverted.

Safety performance test system of 4 ZHZ36 type busbar Use and operation

Four point one Open the cabinet back plate, the attachment box test and test grounding clip respectively output wiring board wiring diagram shown in the right connection. According to identify the corresponding terminal behind the random line and connected to the chassis of. Among them, the top of the AaBb For grounding resistance test end, and the red line of the thick and A The end of the line is thick and black B Beneath the sky; ABCN For insulation test voltage terminal, PE The coat is connected with the measured.

Four point two Carefully check the analyte and the system connection is accurate, the system of power supply and power 220V Connect. Front of the cabinet: a group of air switch is the power switch. Each unit has a power switch independent, normal operation, power supply should be independent each single open, then open the power switch.

Safety performance test system of 5 ZHZ36 type busbar The software part

Five point one The software system

( One ) WindowsInstaller3.1

( Two ) .NETFramework3.5SP1

( Three ) Office2003

Five point two Software installation

The software for the green software, no installation, just send the copy to the user specified directory, double-click the busbar tester .exe You can open.

Five point three The main interface of the software open the software:

One The first line of the display interface:

( One New) Excel Create a file, click. Excel Each boot file, you must create a new file.

( Two Open) Excel The file, click save, open Excel File folder. Click on the corresponding Excel In this file, file to save the data.

( Three The measured input) number, place the cursor in the input box to enter white, each measured object number.

( Four ) communication port selection, click the triangle down, you can choose the communication interface.

( Five Input) inspector, place the cursor in the input box to enter white, each inspector's name.

( Six Click on the need to shut down, shutdown), this key point.

Two Display second lines for:

( One ) measurements show that the display standby or test test.

( Two ) data show that the end of the test, switch to the interface you can see the measurement results.

Three The display interface on the right:

(1 ) test start, click, the system according to the required test items and test conditions. Every time after the end of the test, must click, can the next test. The next test before the input object number, then click next, analyte test. During the test, do not click any key.

(2 Test reset), click, when the instrument alarm or to interrupt the test, click this button.

(3 ) system settings, click, pop-up interface is as follows

In the measurement box, double-click to measure the project is double - click the project into the "measurement" box.

Project light: normal test for grey; yellow; green is red and not qualified qualified.

The project failed to measure: in the process of testing "measurement project" box one project failed, the measurement project light color is red, is testing the unqualified project. Instrument testing, alarm. Click "OK" to set the end system.

The time display, according to each item set time value for testing time. In One ~ 99S Set up。

Four The interface part of each test item display test.

( One Pressure) : Right click the pop-up dialog box to set the voltage withstand voltage. Can be set

One The current alarm : 1 ~ 100mA ;

Two Test time : 1 ~ 99S .

Click OK to save the setting parameters, click "Cancel" new parameter settings are not saved, save the original parameter set.

( Two Insulation) : Click on the right side of the insulation, the insulation configuration dialog box pops up. Can be set

The test voltage : 500V or 1000V ;

The alarm resistance : 1 ~ 1000M W;

Three Test time : 1 ~ 99S .

Click OK to save the setting parameters, click "Cancel" new parameter settings are not saved, save the original parameter set.

( Three Ground) : Click on the right side of the ground, the ground setting dialog box pops up. Can be set

The alarm resistance : 20 ~ 500m W;

The test time : 1 ~ 99S .

Click OK to save the setting parameters, click "Cancel" new parameter settings are not saved, save the original parameter set.

All parameters are set to end, click test.

Five point four Print interface

Six Random accessories

( One ) test grounding clip One pay

( Two High voltage test line) One set

( Three Manual) One share

( Four Certificate) One share

( Five Software CD) One share

Seven Other

Seven point one When ordering, should provide the measured electrical parameter testing technical requirements.

Seven point two Users have special requirements on the integrated testing system, in order to be presented in detail.

Seven point three If you need to check the function of the test system is normal, the user can select" ZHZ36 Integrated test system type electrical safety performance simple calibration device for routine simple diagnosis.

Seven point four The system should keep the temperature in the indoor environment Zero C ~ Forty C, relative humidity of not more than 80% In the air, and not enough to contain harmful substances caused by corrosion.

Seven point five Since the date of purchase system users Twelve Within a month, when users use fully comply with the rules in the specification, and the user does not change the situation to the internal structure of the system, that system is not working properly, then the manufacturer should be responsible for free to replace or repair.

Seven point six Factory has the right to make changes to the products without prior notice.

L EFUP

Poisonous and harmful substances or elements contained in the instrument is not used in the normal conditions, leakage or mutation, users use the instrument will not cause serious pollution to the environment or causing serious damage to the person and property of the period Ten Year. The poisonous and harmful substances or elements of the name and content identification.

A body of XXX, XXX

Shell plating XXX X Eighty

LCD screen X Eighty X Eighty

Circuit board X XXX, eighty

Contactor X XXX, eighty

Transformer ( Pressure regulator X) XXX, eighty

switch X XXX, eighty

Ten: the concentration of the hazardous substance in all homogeneous materials in the parts are in SJ/T11363-2006 The standard limits for the following.

X Said: this hazardous substance contained in at least one of the homogeneous materials. SJ/T11363-2006 Limit standard requirements.

产品留言
标题
联系人
联系电话
内容
验证码
点击换一张
注:1.可以使用快捷键Alt+S或Ctrl+Enter发送信息!
2.如有必要,请您留下您的详细联系方式!
Copyright@ 2003-2025  Shanghai Chi Tang Electronics Co., Ltd.版权所有      电话:13661497600 传真: 地址: 邮编: