Shanghai Chi Tang Electronics Co., Ltd. 主营:
咨询电话:13661497600
产品详情

PA30B type digital three-phase leakage current tester (passive)

  • 如果您对该产品感兴趣的话,可以
  • 产品名称:PA30B type digital three-phase leakage current tester (passive)
  • 产品型号:PA30B 型
  • 产品展商:Shanghai
  • 产品文档:无相关文档
简单介绍

PA30B digital three-phase leakage current tester (passive) is suitable for all kinds of three-phase motor, electrical equipment and instruments, meters, especially the leakage current test of househol

产品描述

1 PA30B digital three-phase leakage current tester (passive) Summary

PA30B Three-phase digital leakage current tester (hereinafter referred to as instrument) is suitable for all kinds of three-phase motor electrical equipment and instruments, especially the leakage current test of household electric appliances. The instrument has the pre setting function, easy to use, the advantages of flexible operation. Is in line with the GB4706.1 The "test" requirements for safety of household and similar electrical appliances - General requirements in terms of test equipment required.

2 PA30B digital three-phase leakage current tester (passive) Specification and technical characteristics

Two point two Power supply AC380V Tolerance Five %, the three-phase four wire system

Two point three The characteristics of products

A For the detection of three-phase electrical leakage current;

B Digital display test results;

C The alarm can be preset limit value;

D Automatically determine the qualified analyte or not.

Two point four The conditions of use

ambient temperature Five C -30 C

The relative humidity is not more than Seventy-five %

No strong electromagnetic interference source, without a lot of dust and corrosive gas, good ventilation.

Two point five Loop resistance measurement Two thousand Omega. One % ( Press GB4706.1-2005/IEC60335-1 Demand GB/T12113 (IEC60990)

Two point six Automatic switch commutation

Two point seven Measuring method One The three-phase power supply applied)

A Turn off phase measurement)

B Continuous phase measurement), N The leakage current of phase - shell

Two Single phase)

Two point eight The power consumption of about 250W (not including the outer loop power consumption).

Two point nine Size 370mm * 260mm * 124mm .

Two point one zero weight 4kg .

3 PA30B digital three-phase leakage current tester (passive) The structure and working principle

Three point three structure

Voltage display settings

Display control interface circuit of current loop resistance measurement

control logic

One "The test voltage" display window Two The leakage current of the display window "

Three And "time" display window Four , "qualified", "alarm" lamps

Five And the "set" button Six And the "start" button

Seven And the "reset" button Eight "Phase change" indicator

Nine The power switch, ""

4 PA30B digital three-phase leakage current tester (passive) Safety precautions

Four point one Before using please read the instructions and follow the instructions step in operation.

Four point two Do not use non original accessories, in order to avoid danger.

Four point three In order to ensure the accuracy of measurement, the test leads should be as short as possible.

Four point four The grounding end of the instrument must be in good contact with the earth.

Four point five The operator must be familiar with equipment operating procedures, can be used.

Four point six The operation of Taiwan necessary insulating rubber laying around.

Four point seven Continuous testing shall not be arbitrarily placed, when not in use shall not be connected with the instrument cabinet and the earth, to prevent the misuse of the test of broken instruments.

Four point eight The measurement must be carefully check whether the wiring is correct, to determine the correct, can be tested.

Four point nine After pressing the "start" button, the instrument shall not adjust the test line and the measured object.

Four point one zero If there is abnormal test instrument, can press the "reset" button or shutdown to suspend the test of instrument, to restore after the start test.

Four point one one In order to ensure the stability of the test voltage, AC power supply and use recommendations to match the output power leakage.

Four point one two The maximum output current as the transformer capacity and exceed this value will cause permanent damage to the instrument.

Four point one three Avoid using in the following circumstances:

A Avoid placing the direct sunlight and rain or wet;

B Please stay away from fire and heat, to prevent the high temperature of the machine;

C Handling or maintenance, should be shut down and will remove the power line.

5 PA30B digital three-phase leakage current tester (passive) Use and operation

Five point one The initial state

The power supply is switched on, the "power" on the "open" position, the power indicator light, display as "voltage" 000V "Current" display. 00.00mA , "time" display 000S . The lights out, the instrument is in the initial state.

Five point two Function setting

Three phase measuring set:

The test set for phase selection, start time setting can be set 0~999s, The commutation time setting can be set 1~5s . Connection method for A (rear), B and C and N Phase.

The three-phase continuous phase measuring set:

The test set for phase selection, start time setting can be set 0~999s, The commutation time is set to Zero . Connection method for A , B and C and N Phase.

Single phase measuring set:

The test set for phase selection, start time setting can be set 0~999s, No commutation time setting. Connection method for C and N Phase.

5.2.1 The test set

The test phase selection set

In the "initial state" press "set" button, "measuring the voltage" window "character, the leakage current" window character or "set" button, rotating, to do three test selection, test A (panel indicator), B and C Phase. To do the single-phase test selection, test N and L Phase.

The current alarm set

In the function test phase selection "press" set "button, or power on the" initial state "two press" set "button," measuring the voltage "window" character, the leakage current of "window value," set "button, the rotation can change the alarm value.

Start time setting

The function of "the current alarm setting state" press "set" button, or power on the "initial state" three press "set" button, "measuring the voltage" window "time window" character, numerical, rotating "set" button, can change the start time value.

Commutation time setting

Set the state "press" set "button in the" startup time or power on the "initial state" four press "set" button, "measuring the voltage" window "time window" character, numerical, rotating "set" button, can change the commutation time value. The maximum value for the commutation time 5S . Such as the choice of single phase test, the state will not appear.

Enter the start test

Set the state "press" set "button in the" startup time, or in the "commutation time setting" press "set" button, enter the test status.

Five point three testing procedure

5.3.1 Complete the function set, the instrument is in the initial state.

5.3.2 The wiring row and the measured.

Five point four Start measurement

Press the start button, start measuring.

Five point five Stop measuring

The measuring time to press the reset button or when measuring and measuring end.

Communication interface pin definition:

1------12V

5------JT

7------JA

9------JB

11-----JC

The communication port wiring out , Relay ( Relay type : HG4041, For reference only ). The voltage relay 12V.

Six Complete

PA30B Three-phase digital leakage current tester one

The terminal pad only five

The use of a statement

One copy of certificate of product

ABCN Test end

Shell

L1L2L3N (ground)

Seven

Seven Other

Seven point one The instrument should keep the temperature in the room Zero C ~ Forty C, relative humidity of not more than 80% In the air, and not enough to contain harmful substances caused by corrosion.

Seven point two Since the date of purchase instrument users Twelve Within a month, when users use fully comply with the rules in the specification, and the user does not attempt to change the instrument internal structure, it is found that the instrument is not working properly, then the manufacturer should be responsible for free to replace or repair.

Seven point three Factory has the right to make changes without notice to the product.

Eight User calibration instructions

One The calibration before the preparation: the communication interface Thirteen and Twenty-five The pin short joint.

Two Test voltage: voltage source voltage calibration is inserted into the corresponding pile head. Open the instrument, voltage test voltage value and phase of the display window corresponding indicator. Press the start button to switch phase.

The phase corresponding to the indicating lamp voltage

A Light A - N Voltage

B Light B - N Voltage

C Light C - N Voltage

A Light, B Light A - B Voltage

A Light, C Light A - C Voltage

C Light, B Light C - B Voltage

Three . the leakage current calibration: the current source is inserted N And the ground terminal installed in the instrument head, can open from the window to read the current value of leakage current.

Four . note: calibration of voltage and current values for the voltage and current of the instrument shall not exceed the specified value. Is any a single-phase voltage shall not exceed AC300V , phase voltage not exceeding AC520V Current, shall not exceed AC22mA .

One External line required Four (intermediate relay 12V )

Two External line required Four A contactor

Three Interface JA , JB , JC , JT , 12V by PA30B A communication port (PA30B passive )

产品留言
标题
联系人
联系电话
内容
验证码
点击换一张
注:1.可以使用快捷键Alt+S或Ctrl+Enter发送信息!
2.如有必要,请您留下您的详细联系方式!
Copyright@ 2003-2025  Shanghai Chi Tang Electronics Co., Ltd.版权所有      电话:13661497600 传真: 地址: 邮编: